Client Ministry of Health (Singapore)
Architect Surbana Jurong
Professional Engineer Surbana International Consultants
The project adopts a modular construction method: PPVC system which proves to be quicker and globally more cost-effective. Prefabricated units are produced in the plant, with most of their interior finishes, then assembled directly on site. Although this requires a highly rigorous approach from a programming point of view, the system saves up to 20% in construction time and substantially reduces dust and sound pollution on the site.